Royal Mail

royalmail_case_study.jpg

Maypole engineering Solutions limited supplied six identical postal receiving systems
into Royal Mail’s new distribution centre.

The new systems in each case were to be integrated into the existing systems.
All six systems were designed, manufactured and installed within the project time frame.

The systems included various widths of belt conveyor set at different heights and inclines.
Manual work stations were also built into the facility.